SKKU Reserach Team Awakens “Hidden Oxygen” to Produce Green Hydrogen

SKKU Reserach Team Awakens “Hidden Oxygen” to Produce Green Hydrogen

A joint research team led by Professor Hyung Mo Jeong from the School of Mechanical Engineering at Sungkyunkwan University (SKKU) and Professor Ji Hoon Lee from the School of Materials Science and Engineering at Kyungpook National University has developed a highly efficient, non-precious metal water-splitting catalyst. By precisely controlling the bond spacing at the atomic level, the team successfully...

Barrow hydrogen project given formal go ahead – cumbriacrack.com

Barrow hydrogen project given formal go ahead – cumbriacrack.com

An artist impression of the siteBarrow’s green hydrogen project has been given a formal go ahead.Carlton Power will work with Kimberly-Clark, which produces Andrex and Kleenex, to supply green hydrogen to its manufacturing plant long-term.Schroders Greencoat estimated that the Kimberly-Clark Barrow site will reduce its consumption of natural gas by up to 50 per cent with a reduction of 18,300 tonnes...

Germany secures EU approval for €1.3bn hydrogen subsidy auction

Germany secures EU approval for €1.3bn hydrogen subsidy auction

The European Commission has authorised Germany to allocate €1.3bn ($1.5bn) in subsidies to green hydrogen projects via the European Hydrogen Bank’s (EHB) Auctions as a Service (AaaS) platform.Confirmed under EU State aid rules, subsidies will be delivered as grants per kilogram of hydrogen across a ten-year period for projects which missed out on the EHB’s third round...

ITM Power Edges Closer to £46.5m Grant as Chronos Rollout Gains Industrial Backing

ITM Power Edges Closer to £46.5m Grant as Chronos Rollout Gains Industrial Backing

UK watchdog approves key step for ITM Power's £86.5M state funding, including £46.5M grant, to expand Sheffield electrolyser plant and cut costs 40%. A key regulatory assessment has brought ITM Power’s state-backed funding package one step closer to final approval. The Subsidy Advice Unit (SAU) published its official opinion on the £46.5 million grant proposed by the UK’s...

A Middleware Approach to AI-Ready Power Asset

A Middleware Approach to AI-Ready Power Asset

How industrial middleware unlocks the full value of operational data AI and why most AI programs fail without it   Power companies are being asked to deliver higher reliability while their operating environment becomes more dynamic. Conventional power generation: must run with greater flexibility, grid assets must absorb new load patterns, renewable portfolios must operate as dependable capacity, and...

Barrow hydrogen project given formal go ahead – Business Crack

Barrow hydrogen project given formal go ahead – Business Crack

Pictured: Keith Clarke, Carlton Power’s founder and chief executive; Eric Adams, Carlton Power’s hydrogen projects director; Michael Shanks, minister for energy; James Samworth, partner and co-head of M&A at Schroders Greencoat; Kristian Høeg Madsen, co-head of hydrogen investments at Schroders GreencoatBarrow’s green hydrogen project has been given a formal go ahead.Carlton Power will work...

250km in single refill, but here’s why hydrogen buses may not work in city | Delhi News

250km in single refill, but here’s why hydrogen buses may not work in city | Delhi News

New Delhi: Two hydrogen-powered shuttle buses recently became operational in Central Vista area, making it the first such service for the city. Each hydrogen bus is equipped with four cylinders mounted on the roof, taking the total capacity to about 30 kg.On a single refill, a hydrogen bus can travel nearly 250 km. Currently, the buses cover about 180 km daily, including trips to Indian Oil...

UMOE Advanced Composites Lands New MEGC Order from P2X Solutions for Finland Hydrogen Project – News and Statistics

UMOE Advanced Composites Lands New MEGC Order from P2X Solutions for Finland Hydrogen Project – News and Statistics

May 20, 2026 UMOE Advanced Composites has secured a follow-up order from its existing client P2X Solutions, according to a report published on Hydrogen Central. The agreement covers three 45-foot high cube Multi-Element Gas Containers intended for a Power-to-X hydrogen project located in Finland.This latest order follows a previous delivery made by UMOE Advanced...

Compare listings

Compare