Tuesday 25 Aug 2026 · Nº 237 Signal Europe is doubling down on molecule and long-duration storage infrastructure—a 15-year Norway–Germany gas contract, a completed 100 MW electrolyser plant, and a 2.1 GWh vanadium flow battery—while the US retreats, redirecting a $500m grant from green steel back to coal-based blast furnaces. The divergence is stark: as CertifHy operationalizes...