UK engineering and consulting firm Wood has secured a front-end engineering design (FEED) contract for the proposed BarMar subsea hydrogen pipeline connecting Spain and France.
The BarMar consortium, comprising Spanish gas transmission operator Enagás and its French counterparts NaTran and Teréga, awarded the contract.
Wood will undertake engineering work for the approximately 380km offshore pipeline and associated compression facilities, both designed to handle pure hydrogen.
The scope includes subsea pipeline design, route engineering, microtunnelling, and hydrogen infrastructure engineering. Wood’s teams in Spain and the UK will lead the work, with completion scheduled for April 2028.
Wood has been involved since the project’s conceptual stages in 2022, previously carrying out pre-FEED engineering for the pipeline and compression facilities, alongside technical support for offshore route investigations.
As Splash reported on Thursday, Italian offshore survey specialist Next Geosolutions secured a contract from BarMar to investigate a 366km offshore corridor between Barcelona and Fos-sur-Mer. The Italian firm will deploy two vessels for geophysical and geotechnical investigations, unexploded ordnance surveys, seabed sampling, and remotely operated vehicle inspections. Offshore work is expected to begin before the end of this year and wrap up around mid-2027.
The BarMar pipeline, estimated to cost €2.4bn ($2.6bn), forms part of the wider €2.85bn ($3.12bn) H2med hydrogen transport corridor, which also includes the CelZa pipeline between Portugal and Spain.
The developers are targeting commercial operations in 2032, with the infrastructure designed to transport up to 2m tonnes of green hydrogen annually from the Iberian Peninsula to industrial markets across Europe.