thyssenkrupp nucera and Fraunhofer IKTS opened the first SOEC pilot production plant for electrolysis stacks on May 27 in Arnstadt, Thuringia, in the presence of high-ranking representatives from science, politics, and industry. The event was also attended by the Minister President of the State of Thuringia, Prof. Dr. Mario Voigt. With the commissioning of the pilot production plant,...