On 7 May 2026, the results from the third edition of the European Hydrogen Bank (EHB) were published. A total of €1.09 billion was allocated across nine projects with a combined electrolyser capacity of 1.1GW. Over the first ten years of their lifespan, these projects will see the production of 1.3 million tonnes (Mt) of RFNBO and low-carbon electrolytic hydrogen and the reduction of around 9 Mt of...