The Chilean government has announced the withdrawal of the environmental impact study (EIS) from the H2 Magallanes green hydrogen and ammonia project in the Magallanes and Chilean Antarctica region, Chile (Chilean government press release, 13/11/2026). According to the announcement, the project holder TEC H2 MAG SPA presented its withdrawal thereby bringing the project’s environmental authorisation procedure to an end.
The USD16bn project consisted of 616 wind turbines of 8 MW each for a combined capacity of 5 GW, seven electrolysis hubs with a total capacity of 3.85 GW, and it was expected to produce about 4.4 Mt/year of green ammonia with commissioning envisaged around 2030.
According to Gas World, TotalEnergies cited “significant development expenses” and studies that determined that “demand for green molecules remains insufficient to ensure long-term offtake on ‘economically viable terms’”.
TEC H2 is owned 80% by TotalEnergies and 20% by Eren.