The 10MW of alkaline machines will be installed at AGIG’s 10MW Hydrogen Park Murray Valley facility, the output from which will be blended into the local gas grid
The 10MW of alkaline machines will be installed at AGIG’s 10MW Hydrogen Park Murray Valley facility, the output from which will be blended into the local gas grid
Compare listings
Compare