Protected: 30 MW Chemmed Park Tarragona

  • €4.950.000
  • €165.000/MW
Chemmed Cluster Tarragona, Av. Marquès de Montoliu 2, 43002 Tarragona

Protected: 30 MW Chemmed Park Tarragona

Chemmed Cluster Tarragona, Av. Marquès de Montoliu 2, 43002 Tarragona, Tarragona, Spain
  • €4.950.000
  • €165.000/MW
For Investment Funding Round Completed

Overview

Project ID: H2-HZ26
  • Co-Development
  • Project Type
  • 30 MW
  • Electrolyser Capacity
  • 1.200 tons/year
  • Hydrogen Production Capacity
  • 40 MW
  • On-Site Solar Plant Capacity (MW)
  • 10 MW
  • BESS
  • 49%
  • % Equity Available for Purchase via SAFE

Project Viability Risk Assesment

  • Project Viability Risk Scoring: AA
  • Quantitative Risk Assessment: 85,24
  • Executive Summary: LOI Signed with Off-Taker. Permitting process only pending of final Water Usage Concesion.
  • AAA
  • 85,24 | Viability Risk AA
    AA
  • A
  • BBB
  • BB
  • B
  • CCC
  • CC
  • C
Green Hydrogen Project Credit Rating Scale
Level Code Description
1 AAA - Prime Viability Exceptional financial and technical standing, full regulatory compliance, clear market demand, and minimal risk exposure. The project is in a mature and reliable position for investment.
2 AA - Superior Viability High market position and demand, few remaining regulatory steps, and solid technical and operational frameworks. Minor risks may remain, but overall viability is strong with a low-risk profile.
3 A - High Viability Project has a stable financial structure, well-defined market potential, and reasonable technical assurance. Moderate risks exist but are manageable, with a positive outlook on feasibility.
4 BBB - Sound Viability Moderate financial and regulatory security with some risks, such as dependency on subsidies or technology advancements. Overall positive project outlook with some external dependencies.
5 BB - Developing Viability Permits and financing are in progress, with moderate policy or subsidy dependencies. Project has potential but could face risks like cost overruns or market uncertainties.
6 B - Speculative Viability Early financing stages with high reliance on favorable regulatory conditions. The project faces technical and market risks but has potential for growth with adequate support.
7 CCC - High Speculative Viability High-risk profile with incomplete permits, uncertain financing, and technical feasibility still being validated. Relies heavily on favorable market conditions or substantial external funding.
8 CC - Very High Speculative Viability Limited financial backing, regulatory uncertainties, and significant operational challenges. The project’s success depends on favorable shifts in policy, market demand, or breakthrough technology.
9 C - Critical Speculative Viability Extremely high risk with minimal financing, lack of regulatory pathway, and significant technological and market challenges. High probability of delays or failure without substantial external support.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Project Description

This content is password protected. To view it please enter your password below:

Project Details

  • Price €4.950.000
  • Transaction Type Simple Agreement for Future Equity (SAFE)
  • % Equity Available for Purchase via SAFE 49%
  • Electrolyser Capacity 30 MW
  • Hydrogen Production Capacity 1.200 tons/year
  • Connection to Gas Grid Gas-Grid-Connected
  • Energy Supply On-Site Solar Plant and Power Purchase Agreement (PPA)
  • Water Source Desalinated Water
  • Connection to Electricity Grid Electricity-Grid-Connected
  • Hydrogen Storage Capacity 50 tons
  • BESS 10 MW
  • Permitting Milestones Completed Electricity Grid Connection, Gas Grid Connection, Water Use Permit, Land Use Permit, Environmental Permit, Preliminary Feasibility Study, Site Selection
  • Electrolyser Manufacturer ITM
  • Electrolyser Type Proton Exchange Membrane (PEM)
  • Electrolyser Efficiency 70%
  • Status Hydrogen Power Agreement (HPA) HPA in negotiation
  • Percentage of Annual Production Sold under HPA 100%
  • Tenor of Hydrogen Purchase Agreement (HPA) 10 years
  • Green Hydrogen Subsidies Available No
  • Electricity Production from On-Site Solar Plant (P-50) 54.000 MWh
  • Solar Tracking System Available Yes
  • PPA-Type Pay-as-Produced
  • Tenor PPA 10 years
  • PPA Technology Wind Onshore
  • PPA Capacity (MW) 6 MW
  • PPA Electricity Production (P-50) 15.000 MWh
  • PPA Price 35 €/MWh
  • Risk-Management PPA No
  • Organisation Legal Form S.L.
  • Latitude / Longitude 41.100354, 1.187955
  • On-Site Solar Plant Capacity (MW) 40 MW

Project Documents

Property Document

Address

  • Address 905 Brickell Bay Dr
  • Country Spain
  • City Tarragona
  • Zip/Postal Code 33131
  • Protected: 30 MW Chemmed Park Tarragona

Compare listings

Compare
Ramon Ramírez
  • Ramon Ramírez